About RAFS

Rudra Aluminium Formwork System (RAFS) is an established environment friendly organization in Aluminium Formwork System serving the construction industry with updated and customized solutions.

An ISO 9001:2015 certified company located in Faridabad, Haryana. We are well supported by in-house Research & Development activities.

Rudra Formwork System with continuous innovations using latest technology and System, highly professional project support team committed to provide Formwork System which is not only of high quality but also enables our client to achieve faster slab cycles at competitive prices. We expertise in designing the Formwork system by using high end software such as Staad Pro, Revit and Auto CAD to meet our specific requirement. Today our satisfied clients include some of the reputed corporate builders Developers, and Construction Companies. As a reflection of our

Quality, after Sales Services and Customer support, we have been able to retain our client's faith in getting their repeated orders.

Salient Features of Rudra Aluminium Formwork

Latest International Technique: We use latest software for designing and drawing such as Staad pro, Revit and AutoCAD which gives real time design solution as compared to old conventional designing method. We tale utmost care for the safety of Formwork and structure in our designs.

High end Finishing: Since Components of Rudra Aluminium Formwork System are manufactured extruded Aluminium  alloy hence tolerances in the dimension are not more than 2mm. The smooth surface of Aluminium gives excellent concrete finish hence plaster activity could be avoided.

Easy Erection: Easy assembly and zero assembly error makes the system fast due to which there is reduction in the timings of slab cycle.

Reduced Slab Cycle and Faster Completion: By using Rudra Aluminum Formwork all shear walls, columns, core walls, slab and beams can be cast          together resulting in less days of slab cycle

Crane Free Movement: Due to the lighter weight of the components the formwork can be shifted from one floor to another manually without using the crane.

Less Inventory and Economical: In Rudra Aluminum Formwork system slab and beam can be stripped after three days (Bases on the concrete strength) leaving behind the props head together with the Prop. Walls and Columns can be DE shuttered after Twenty four hours. Early stripping of Rudra formwork reduces inventory and parts handling due to which there is the great reduction in cost.

Saving Human Labour: ue to the replacement of blockwork with RC wall in the structure no labor is required for block work and Plastering.

Safety of Workers: The stripping system allows parts to be recovered without falling down contributing the workers’ safety. The number of the props defined the system ensures the quick and assembly.

High Repetition and Durability: Since all the components of Rudra Aluminium are getting manufactured by using state-of-the-art technology and very high quality of the Aluminiumalloy 6061 has been used. Due to the high tensils strength of the alloy it yields after very high repetition (250 times).

No Requirement of Scaffolding: The brackets provided at the outer periphery of the structure ensures the safety of the workers and eliminate the requirement of outer facade scaffolding.

Quality and Testing: Each and every component of Rudra Aluminium Formwork system has been tested in the state of the art laboratory. With our R&D department continuously researching for newer and detter products we will maintain our leading position as leader of the Aluminium formwork system against our competitor.

Good Resale Value: The resale value of Aluminium is much higher than that of steel.

Eco-Friendly: Rudra Aluminium formwork is all Aluminium and 100% wood free which gives the superior finish to the concrete.